Want to know Ucertify 70-247 Exam practice test features? Want to lear more about Microsoft Private Cloud Configuration and Deployment with System Center 2012 certification experience? Study Top Quality Microsoft 70-247 answers to Improved 70-247 questions at Ucertify. Gat a success with an absolute guarantee to pass Microsoft 70-247 (Private Cloud Configuration and Deployment with System Center 2012) test on your first attempt.


♥♥ 2021 NEW RECOMMEND ♥♥

Free VCE & PDF File for Microsoft 70-247 Real Exam (Full Version!)

★ Pass on Your First TRY ★ 100% Money Back Guarantee ★ Realistic Practice Exam Questions

Free Instant Download NEW 70-247 Exam Dumps (PDF & VCE):
Available on: http://www.surepassexam.com/70-247-exam-dumps.html

Q11. HOTSPOT - (Topic 6) 

You create a virtual machine template that has the following properties: 

Use the drop-down menus to select the answer choice that completes each statement. 

Answer: 

Topic 7, Mix Questions

70. - (Topic 7) 

Your company has a primary data center and a secondary data center. The primary data center contains five servers. The servers are configured as shown in the following table. 

You plan to configure Server5 to protect the data from all of the servers on the network. 

You need to recommend a backup solution that meets the following requirements: 

. The data must be available if the primary data center fails. 

. The solution must retain data for up to two years. 

Which two actions should you include in the recommendation? Each answer presents part of the solution. 

A. Deploy a secondary DPM server to the primary data center and configure the new DPM server to protect Server5. 

B. Deploy a primary DPM server to the secondary data center and configure the new DPM server to protect the physical disks on Server5. 

C. On Server5, back up the data on all of the protected servers to Windows Azure Recovery Services. 

D. Deploy a secondary DPM server to the secondary data center and configure the new DPM server to protect Server5. 

E. On Server5, back up the data on all of the protected servers to physical disks. 

Answer: C,D 


Q12. DRAG DROP - (Topic 6) 

You need to recommend the configuration for Customer1 to ensure that the customer can deploy a copy of an on-premises virtual machine to Windows Azure. 

Which three actions should you recommend performing in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order. 

Answer: 


Q13. - (Topic 7) 

Your network contains a server named Server1 that has System Center 2012 Virtual Machine Manager (VMM) installed. 

You plan to deploy a service named Service1. Service1 will contain three tiers. Each tier will contain 10 instances. 

You need to configure the service template to ensure that when an application in Service1 is upgraded, Service1 remains available. 

What should you configure for each tier? 

A. The maximum instance count 

B. The preferred servicing order 

C. The number of upgrade domains 

D. The minimum instance count 

E. The preferred deployment order 

Answer:

Explanation: To minimize service interruptions when a tier is updated in-place, you can specify more than one upgrade domain in the tier properties. When the tier is updated, VMM updates the virtual machines in the tier according to the upgrade domain to which they belong. VMM upgrades one upgrade domain at a time, shutting down the virtual machines running within the upgrade domain, updating them, bringing them back online, and then moving on to the next upgrade domain. By shutting down only the virtual machines running within the current upgrade domain, VMM ensures that an upgrade takes place with the least possible impact to the running service. 

URL: http://technet.microsoft.com/en-us/library/gg675089.aspx 


Q14. DRAG DROP - (Topic 6) 

You need to recommend a solution to ensure that Customer1 will be able to establish a site-to-site VPN connection between its on-premises private cloud and its hosted private cloud. 

Which three actions should you recommend performing in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order. 

Answer: 


Q15. - (Topic 3) 

You need to recommend a solution to control the provisioning of the virtual machines by the research department users. The solution must meet the requirements for managing services in the private cloud. 

What should you include in the recommendation? (More than one answer choice may achieve the goal. Select the BEST answer.) 

A. VMM placement rules and Service Manager service offerings 

B. VMM custom properties and Orchestrator runbooks 

C. VMM placement rules and capability profiles 

D. A separate VMM cloud for the research department users 

Answer:

Explanation: 

The Research department contains clustered Hyper-V hosts and standalone Hyper-V hosts. When research users deploy an instance of App1, the VMs in App1 must be highly available. Therefore, they must be deployed to the clustered Hyper-V hosts. A capability profile can specify that a VM must be highly available and a placement rule can ensure it is deployed to clustered Hyper-V hosts. A private cloud including the standalone Hyper-V hosts would not ensure this. 


Q16. - (Topic 5) 

You need to configure connectors between the System Center 2012 components to meet the administrative requirements. Between which System Center 2012 components should you configure the connectors? 

A. Operations Manager and Orchestrator 

B. Service Manager and VMM 

C. Operations Manager and Service Manager 

D. Configuration Manager and Service Manager 

Answer:

Topic 6, Fabrikam, Inc 

Overview 

Fabrikam, Inc. is an IT services and hosting provider. 

Fabrikam has two main data centers. The data centers are located in New York and Montreal. The data centers connect to each other by using high-bandwidth, low latency WAN links. Each data center connects directly to the Internet. 

Existing Environment 

The network contains an Active Directory forest named fabrikam.com that is dedicated to hosting services. All of the servers in the forest run Windows Server 2012 R2. 

The network contains a System Center 2012 R2 infrastructure that includes the following 

components: 

Windows Azure Pack for Windows Server 

Virtual Machine Manager (VMM) 

Service Provider Foundation 

Operations Manager 

Orchestrator 

Fabrikam has implemented Hyper-V Network Virtualization in the hosting environment. 

All storage is either SAN-based or direct-attached storage (DAS). All VMM library servers use DAS storage. None of the VMM library servers are managed as VMM Hyper-V hosts. 

Each Hyper-V host has four 10-GbE network adapters. 

Requirements 

Business Goals 

Fabrikam plans to provide hosting services to two customers named Customer1 and Customer2. Customer1 is based in New York and Customer2 is based in Montreal. IT services will include assistance managing the services in the following table. 

The internal network of Customer1 contains a System Center 2012 R2 infrastructure that includes the following components: 

Operations Manager 

App Controller 

VMM 

Customer1 plans to deploy multi-tier VMM services that run Internet Information Services (IIS), .NET applications, and Microsoft SQL Server. Customer1 plans to deploy non-clustered virtual machines only. 

Planned Changes 

Fabrikam plans to implement the following changes to the network: 

Deploy a Remote Desktop Gateway (RD Gateway) virtual machine. 

Replace the SAN by using iSCSI targets on servers that run Windows Server 2012 

R2. 

General Requirements 

Fabrikam identifies the following requirements for the planned deployment: 

   Hyper-V hosts must remain available if a single network adapter fails. You must be 

able to control the amount of bandwidth allocated to iSCSI traffic and Failover 

Clustering redirected traffic. 

    Virtual machines that run in the Fabrikam data centers must remain available if a 

single data center fails. The recovery point objective (RPO) must be 30 seconds. 

   The IT staff at Fabrikam must be able to mount iSCSI target logical units on Hyper-

   V hosts directly from the Virtual Machine Manager console. 

Hyper-V management and storage traffic must be separated from the network 

traffic generated by virtual machine guests. 

Virtual machines must be deployed by using a SAN copy. 

If a site fails, a failover must be invoked manually. 

Customer1 Requirements 

Fabrikam identifies the following requirements for Customer1: 

Customer1 will use Hyper-V Network Virtualization in its hosted environment. 

Customer1 will require the ability to manage all of its cloud services from a single 

interface. 

Each deployment of a virtual machine for Customer1 must trigger the execution of 

a runbook by using the Orchestrator web service. The runbook must execute 

before any user account logs on to the virtual machine. 

Customer2 Requirements 

Fabrikam identifies the following requirements for Customer2: 

   . Customer2 must be able to connect to the console of the hosted virtual machines. 

   . All of the metadata for any of the virtual machines of Customer1 must not be 

stored in Windows Azure. 


Q17. HOTSPOT - (Topic 7) 

You have a System Center 2012 Virtual Machine Manager (VMM) infrastructure. You create a SQL Server Profile. 

You plan to deploy new virtual machines based on a virtual machine template named VT1. You need to ensure that the SQL Server Profile is applied to the new virtual machines. 

Which object should you create from the VMM Administrator Console? To answer, select the appropriate object type in the answer area. 

Answer: 


Q18. - (Topic 4) 

You need to configure the environment to meet the requirements for private cloud compliance. 

What should you do first on Server1? 

A. Create a Data Collector Set (DCS). 

B. Install the Network Policy and Access Services server role. 

C. Install the WSUS Administration console. 

D. Configure the Audit Collection Services (ACS). 

Answer:


Q19. - (Topic 7) 

Your network contains a domain named contoso.com. The domain contains five virtualization servers. The servers are configured as shown in the following table. 

The network also contains a server named Server6 that runs VMware vCenter Server. 

In the domain, you install System Center 2012 Virtual Machine Manager (VMM) on a server 

named Server7. You configure Server7 to manage Server7. 

You need to ensure that you can add all of the servers to the VMM fabric. 

Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.) 

A. Upgrade Server1 to Hyper-V Server 2008 R2 Service Pack 1 (SP1). 

B. Upgrade Server2 to Hyper-V Server 2008 R2 Service Pack 1 (SP1). 

C. Install Hyper-V Server 2008 R2 Service Pack 1 (SP1) on Server3. 

D. Install Hyper-V Server 2008 R2 Service Pack 1 (SP1) on Server4. 

E. Install Hyper-V Server 2008 R2 Service Pack 1 (SP1) on Server5. 

Answer: C,D 


Q20. DRAG DROP - (Topic 1) 

You need to configure the storage fabric to support the deployment of the virtual machines. The solution must meet the cloud requirements. 

Which three actions should you perform in sequence? (To answer, move the appropriate three actions from the list of actions to the answer area and arrange them in the correct order.) 

Answer: