NEW QUESTION 1
The Mann-Whitney Test is used to test if the Means for two samples are different.
- A. True
- B. False
Answer: B
NEW QUESTION 2
Which element of waste best describes "the unnecessary movement of materials and/or goods"?
- A. Overprocessing
- B. Motion
- C. Conveyance
- D. Correction
Answer: C
NEW QUESTION 3
SPC on the outputs is more preferred than SPC on the inputs when implementing SPC for your process.
- A. True
- B. False
Answer: B
NEW QUESTION 4
Hypothesis Testing can save time and help avoid high costs of experimental efforts by using existing data.
- A. True
- B. False
Answer: A
NEW QUESTION 5
The Empirical Rule is important because it provides an estimate of the probability of an event occurring depending on the Standard Deviation from the Mean.
- A. True
- B. False
Answer: A
NEW QUESTION 6
One of the metrics commonly used in Lean Six Sigma is DPU. This acronym stands for __________.
- A. Deferred planned usage
- B. Defects per unit
- C. Decreased production utilization
- D. Downtime per unit
Answer: B
NEW QUESTION 7
Lean focuses on the sequence of activities and work required to produce a product or a service. This flow is called a __________.
- A. Value-add Flow
- B. Production Map
- C. Value Stream
- D. Operating Procedure
Answer: C
NEW QUESTION 8
Process Capability is a function of which of these?
- A. Customer requirements
- B. Process performance
- C. Output over time
- D. All of these answers are correct
Answer: D
NEW QUESTION 9
A Six Sigma tool that helps to screen factors by using graphical techniques to logically subgroup multiple discrete X's plotted against a continuous Y is known as a __________ Chart.
- A. SIPOC
- B. Multi-Vari
- C. Box Plot
- D. Whisker
Answer: B
NEW QUESTION 10
A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.
- A. True
- B. False
Answer: A
NEW QUESTION 11
After reviewing the Capability Analysis shown here select the statement(s) that are untrue.
- A. The process is properly assumed to be a Normal process
- B. The Mean of the process moving range is 1.78
- C. The process is out of Control
- D. This Capability Analysis used subgroups
- E. Majority of the dimensional values are outside of the tolerance than within
Answer: A
NEW QUESTION 12
Which of these is Discrete data?
- A. Train arrived at 4:17 pm.
- B. Race car consumed 23 gallons of fuel.
- C. Of the 42 people on the bus, 12 went into the station.
- D. It took 3 hours and 32 minutes to complete the marathon.
Answer: C
NEW QUESTION 13
According to a manager it takes an average weekday commute of 39 minutes with a Standard Deviation of 7 minutes for the employees to get to work while they use their personal vehicles for their office commute while the management set a policy of not more than 40 minutes for their daily one-way commute. A survey conducted one day on 70 employees showed an average of 34 minutes commuting time using the metro public transportation system with a Standard Deviation of 21 minutes. If the Standard Deviation is uncontrollable then the other option to increase the probability of coming in on time via personal vehicles to work could be __________ ?
- A. Increase the average time of commute
- B. Maintain the average time of commute and change route to work
- C. Reduce average commute time to work by departing earlier
- D. Change policy at work and request for flexible times based on location
Answer: C
NEW QUESTION 14
Use of the __________ approach is the most classic arrangement when constructing a Fishbone Diagram.
- A. Chronological
- B. 6M
- C. 5M
- D. Alphabetical
Answer: B
NEW QUESTION 15
Nominal Scale data consists of names, labels or categories and cannot be arranged in any mathematical ordering scheme. Complex arithmetic functions cannot be easily applied to Nominal Data:
- A. True
- B. False
Answer: A
NEW QUESTION 16
The very best way to begin an effort to map a process is to do which of these?
- A. Interview the process owner
- B. Interview the manager of the department
- C. Walk the actual process from beginning to end
- D. Take pictures of the factory floor at each shift
Answer: C
NEW QUESTION 17
When looking at a distribution graph, the Mean is defined as the __________.
- A. Average based on the sample size
- B. Aggression measured
- C. Total sample size
- D. Measurement based off a quarter of the sample size
Answer: A
NEW QUESTION 18
The use of Kanbans work best with pull systems for determining the timing of which products or services are produced.
- A. True
- B. False
Answer: A
NEW QUESTION 19
......
P.S. 2passeasy now are offering 100% pass ensure CLSSGB dumps! All CLSSGB exam questions have been updated with correct answers: https://www.2passeasy.com/dumps/CLSSGB/ (200 New Questions)