Exam Code: C1000-132 (Practice Exam Latest Test Questions VCE PDF)
Exam Name: IBM Maximo Manage v8.0 Implementation
Certification Provider: IBM
Free Today! Guaranteed Training- Pass C1000-132 Exam.
Free demo questions for IBM C1000-132 Exam Dumps Below:
NEW QUESTION 1
Which two domain types can have a specified error message?
- A. SYNONYM
- B. NUMERIC
- C. TABLE
- D. CROSSOVER
- E. ALN
Answer: D
Explanation:
In IBM Maximo Manage, the two domain types that can have a specified error message are TABLE and ALN.
NEW QUESTION 2
Which statement is true regarding Work Assets in the Safety Plans application?
- A. A Work Asset is either a Location or an Asse
- B. A user does not need to specify Work Assets, as a Safety Plan can be applied without it.
- C. A Work Asset is either a Location or an Asse
- D. A user needs to specify at least one of these for each record.
- E. A Work Asset is either a Rotating Item, a Location, or an Asse
- F. A user needs to specify at least one of these for each record.
- G. A Work Asset is either an Asset, Asset Type, or a Locatio
- H. A user does not need to specify Work Assets, as a Safety Plan can be applied without it.
Answer: A
Explanation:
In the Safety Plans application, a Work Asset is either a location or an asset that requires the safety plan. Each safety plan record must have at least one work asset specified, and the work asset can be a location or an asset.
NEW QUESTION 3
What Downtime Types are available?
- A. Critical and Non-critical
- B. Operational and Non-operational
- C. Planned and Unplanned
- D. Started and Stopped
Answer: B
NEW QUESTION 4
At what database level does a Job Plan exist?
- A. ORG
- B. SYSTEM
- C. SITE
- D. SYSTEMORGSITE
Answer: D
Explanation:
https://maximosecrets.com/2022/04/28/job-plans/
NEW QUESTION 5
The loT Connector provides Maximo Manage, Maximo Health and Maximo Predict the ability to connect to which two data sources?
- A. Maximo Spatial
- B. Maximo Assist
- C. IBM Watson loT Platform
- D. Maximo Safety
- E. Maximo Monitor
Answer: CE
Explanation:
IoT Connector provides Maximo Manage, Maximo Health and Maximo
Predict the ability to connect to C. IBM Watson IoT Platform and E. Maximo Monitor data sources. The IoT Connector in the Administration Work Center can be used to configure a connection to an IoT platform such as IBM Watson IoT Platform and IBM Maximo Asset Monitor1.
NEW QUESTION 6
In which Maximo application can Workflow Delegation be set?
- A. People
- B. Person Group
- C. Workflow Administration
- D. Labor
Answer: A
NEW QUESTION 7
During the course of a Work Order an Asset is upgraded. This change requires the Specification of the Asset to be updated automatically when the Work Order is Completed. How can this be achieved?
- A. A Planned Modification should be defined in the Move/Swap/Modify dialog.
- B. An escalation should be created against the Asset record, triggered when the work order is completed.
- C. A related Service Request should be created of Type CHANGE.
- D. A Follow On Work Order should be created.
Answer: A
NEW QUESTION 8
Which limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type?
- A. Meter Limit
- B. Warning Limit
- C. Measurement Limit
- D. Action Limit -
Answer: D
Explanation:
In IBM Maximo Manage, the Action Limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type.
NEW QUESTION 9
When setting up a Crew Type, Required Crafts and Required Tools can be specified. What other characteristic can be required for the Crew Type?
- A. Required Assets
- B. Required Qualifications
- C. Required Labor
- D. Required Skills
Answer: B
NEW QUESTION 10
What information can be updated in the Master PM application for an associated Preventive Maintenance record (PM)?
- A. Work Order Status
- B. PM Forecast
- C. Generate Work Orders
- D. PM Hierarchy
Answer: D
Explanation:
In IBM Maximo Manage v8.0, the Master PM application is used to manage and control multiple Preventive Maintenance (PM) records through a central template known as the Master PM. The primary purpose of the Master PM application is to provide a standardized structure for PMs and streamline the maintenance process by enabling centralized updates to associated PM records.
The key updates that can be made to associated PMs through the Master PM application include:
✑ Frequency and Scheduling Information - The Master PM can dictate the time- or
meter-based frequency at which work orders are generated, and apply this to all associated PMs (or selectively if desired)
✑ Job Plans and Sequence - Users can specify job plans on a sequential basis, which helps in scheduling varied levels of maintenance activities. Changes to the job plan sequence in the Master PM can be propagated to all associated PMs
✑ Seasonal Dates - Active dates or seasonal adjustments to maintenance activities can be set up within the Master PM, and these adjustments can be transferred to associated PMs as necessary
✑ PM Hierarchy - The Master PM application allows users to configure and manage PM hierarchies, which helps in establishing parent-child relationships among PM
records. This hierarchical structure is especially useful in organizing maintenance tasks for complex assets with interrelated components, ensuring that all relevant maintenance tasks are triggered appropriately
Thus, option D (PM Hierarchy) correctly represents the feature that can be updated in the Master PM application for associated PM records.
NEW QUESTION 11
In what Maximo Manage application are the specifications of an asset for calibration entered?
- A. Classifications
- B. Asset
- C. Data Sheet Template
- D. Improvements
Answer: C
Explanation:
In IBM Maximo Manage, the specifications of an asset for calibration are entered in the Data Sheet Template application.
NEW QUESTION 12
In which status can a Job Plan be modified to add a new task?
- A. NEW
- B. REVISED
- C. INACTIVE
- D. PNDREV
Answer: D
NEW QUESTION 13
In the Organizations application, which action is used to create Inventory Usage documents for new reservations?
- A. Inventory Usage Options
- B. Inventory Options
- C. Work Order Options
- D. Reservation Options
Answer: B
Explanation:
In the Organizations application in IBM Maximo Manage, you should use Reservation Options to create Inventory Usage documents for new reservations.
NEW QUESTION 14
How does a user make a GL account inactive in the Chart of Accounts application?
- A. populate the Expiration Date with a value in the past
- B. select action Add/Modify GL Account
- C. deselect the Active checkbox
- D. select action Change Status
Answer: A
NEW QUESTION 15
When working with Purchase Requests, which statement is correct?
- A. Purchase Request Description is mandatory in the header section.
- B. One Purchase Request can contain both Item and Material type lines
- C. All Purchase Requests must be approved by an authorized person.
- D. Purchase Request must have a vendor specified.
Answer: B
Explanation:
When working with Purchase Requests in IBM Maximo Manage, one Purchase Request can contain both Item and Material type lines.
NEW QUESTION 16
On a Work Order with no GL Account specified, which GL Account will take precedence?
- A. Work Order Control Account
- B. Job Plan
- C. Asset
- D. Location
Answer: C
NEW QUESTION 17
In the Security Groups application which security group are all users added to using default settings?
- A. MAXIMOUSERS
- B. DEFLTREG
- C. DEFUSRREG
- D. NEWUSER
Answer: B
NEW QUESTION 18
Which field on a Work Order is used to only schedule work during working time?
- A. Flow Action Assist
- B. Split Shift
- C. Constrain to Shift
- D. Interruptible
Answer: D
NEW QUESTION 19
......
Recommend!! Get the Full C1000-132 dumps in VCE and PDF From Downloadfreepdf.net, Welcome to Download: https://www.downloadfreepdf.net/C1000-132-pdf-download.html (New 118 Q&As Version)