Your success in Cisco tshoot 300 135 pdf is our sole target and we develop all our ccnp tshoot 300 135 pdf braindumps in a way that facilitates the attainment of this target. Not only is our 300 135 dumps study material the best you can find, it is also the most detailed and the most updated. ccnp tshoot 300 135 Practice Exams for Cisco CCNP Routing and Switching cisco 300 135 are written to the highest standards of technical accuracy.


♥♥ 2021 NEW RECOMMEND ♥♥

Free VCE & PDF File for Cisco 300-135 Real Exam (Full Version!)

★ Pass on Your First TRY ★ 100% Money Back Guarantee ★ Realistic Practice Exam Questions

Free Instant Download NEW 300-135 Exam Dumps (PDF & VCE):
Available on: http://www.surepassexam.com/300-135-exam-dumps.html

P.S. Virtual 300-135 preparation are available on Google Drive, GET MORE: https://drive.google.com/open?id=1b8IflMM01Yv-CELfeZXF0P5UV8NaZBSU


New Cisco 300-135 Exam Dumps Collection (Question 9 - Question 18)

New Questions 9

Given the multicast IP address of 224.193.5.10, what would the corresponding multicast MAC address be?

A. 00-00-0c-c0-05-0a

B. 00-00-0c-cl-05-0a

C. 01-00-5e-00-00-0c

D. 01-00-5e-41-05-0a

E. 00-00-0c-01-00-5e

F. 01-00-5e-cl-05-0a

Answer: F

Explanation:

First three octets are 01-00-05e for every single multicast address.Las three octets are the hexadecimal version of the las three octets of the IP address, in this case 193.5.10 is translated to c1-05-0a.


New Questions 10

A customer network engineer has made configuration changes that have resulted in some loss of connectivity. You have been called in to evaluate a switch network and suggest resolutions to the problems.

Refer to the topology.

SW1 Switch Management IP address is not pingable from SW4. What could be the issue?

A. Management VLAN not allowed in the trunk links between SW1 and SW4

B. Management VLAN not allowed in the trunk links between SW1 and SW2

C. Management VLAN not allowed in the trunk link between SW2 and SW4

D. Management VLAN ip address on SW4 is configured in wrong subnet

E. Management VLAN interface is shutdown on SW4

Answer: D

Explanation:

In the network, VLAN 300 is called the Management VLAN. Based on the configurations shown below, SW1 has VLAN 300 configured with the IP address of 192.168.10.1/24, while on SW4 VLAN 300 has an IP address of 192.168.100.4/24, which is not in the same subnet.


New Questions 11

The implementations group has been using the test bed to do a u2021proof-of-conceptu2021 that requires both Client 1 and Client 2 to access the WEB Server at 209.65.200.241. After several changes to the network addressing, routing scheme, DHCP services, NTP services, layer 2 connectivity, FHRP services, and device security, a trouble ticket has been opened indicating that Client 1 cannot ping the 209.65.200.241 address.

Use the supported commands to isolated the cause of this fault and answer the following questions.

On which device is the fault condition located?

A. R1

B. R2

C. R3

D. R4

E. DSW1

F. DSW2

G. ASW1

H. ASW2

Answer: D

Explanation:

The EIGRP AS number configured on R4 is wrong.


New Questions 12

Which three features are benefits of using GRE tunnels in conjunction with IPsec for building site-to-site VPNs? (Choose three.)

A. allows dynamic routing over the tunnel

B. supports multi-protocol (non-IP) traffic over the tunnel

C. reduces IPsec headers overhead since tunnel mode is used

D. simplifies the ACL used in the crypto map

E. uses Virtual Tunnel Interface (VTI) to simplify the IPsec VPN configuration

Answer: A,B,D


New Questions 13

Which of the following are TACACS+ characteristics? (Choose all that apply.)

A. Cisco proprietary

B. Standards-based protocol

C. Provides separate services for authentication, authorization, and accounting

D. Encrypts only the password

E. Uses UDP for a transport layer

F. Encrypts the entire packet

Answer: A,C,F


New Questions 14

Which two of the following options are categories of Network Maintenance tasks?

A. Firefighting

B. Interrupt-driven

C. Policy-based

D. Structured

E. Foundational

Answer: B,D

Explanation:

Proactive Versus Reactive Network Maintenance:

Network maintenance tasks can be categorized as one of the following: Structured tasks: Performed as a predefined plan.

Interrupt-driven tasks: Involve resolving issues as they are reported.

Reference: CCNP TSHOOT Official Certification Guide, Kevin Wallace, Chapter 1, p.7


New Questions 15

The implementations group has been using the test bed to do a u2021proof-of-conceptu2021 that requires both Client 1 and Client 2 to access the WEB Server at 209.65.200.241. After several changes to the network addressing, routing scheme, DHCP services,

NTP services, layer 2 connectivity, FHRP services, and device security, a trouble ticket has been opened indicating that Client 1 cannot ping the 209.65.200.241 address.

Use the supported commands to isolated the cause of this fault and answer the following questions.

The fault condition is related to which technology?

A. NTP

B. IP DHCP Helper

C. IPv4 EIGRP Routing

D. IPv6 RIP Routing

E. IPv4 layer 3 security

F. Switch-to-Switch Connectivity

G. Loop Prevention

H. Access Vlans

I. Port Security

J. VLAN ACL / Port ACL

K. Switch Virtual Interface

Answer: J

Explanation:

On DSW1, VALN ACL, Need to delete the VLAN access-map test1 whose action is to drop access-list 10; specifically 10.2.1.3


New Questions 16

Which of the following is not an essential prerequisite for AutoQoS to be correctly applied to an interface? (Choose all that apply.)

A. The interface must be configured as a Multilink PPP interface.

B. The correct bandwidth should be configured on the interface.

C. A QoS policy must not be currently attached to the interface.

D. CEF must be enabled.

E. AutoQoS must be enabled globally before it can be enabled on the interface.

F. An IP address must be configured on the interface if its speed is equal to or less than 768 kbps.

Answer: A,E


New Questions 17

The implementations group has been using the test bed to do a u2021proof-of-conceptu2021 that requires both Client 1 and Client 2 to access the WEB Server at 209.65.200.241. After several changes to the network addressing, routing scheme, DHCP services, NTP services, and FHRP services, a trouble ticket has been opened indicating that Client 1 cannot ping the 209.65.200.241 address.

Use the supported commands to isolated the cause of this fault and answer the following questions.

What is the solution to the fault condition?

A. In Configuration mode, using the interface port-channel 13 command, then configure switchport trunk allowed vlan none followed by switchport trunk allowed vlan 20,200 commands.

B. In Configuration mode, using the interface port-channel 13, port-channel 23, then configure switchport trunk none allowed vlan none followed by switchport trunk allowed vlan 10,200 commands.

C. In Configuration mode, using the interface port-channel 23 command, then configure switchport trunk allowed vlan none followed by switchport trunk allowed vlan 20,200 commands.

D. In Configuration mode, using the interface port-channel 23, port-channel, then configure switchport trunk allowed vlan none followed by switchport trunk allowed vlan 10,20,200 commands.

Answer: B

Explanation:

We need to allow VLANs 10 and 200 on the trunks to restore full connectivity. This can be accomplished by issuing the u201cswitchport trunk allowed vlan 10,200u201d command on the port channels used as trunks in DSW1.

Topic 7, Ticket 2 : ACCESS VLAN

Topology Overview (Actual Troubleshooting lab design is for below network design)

u2711 Client Should have IP 10.2.1.3

u2711 EIGRP 100 is running between switch DSW1 & DSW2

u2711 OSPF (Process ID 1) is running between R1, R2, R3, R4

u2711 Network of OSPF is redistributed in EIGRP

u2711 BGP 65001 is configured on R1 with Webserver cloud AS 65002

u2711 HSRP is running between DSW1 & DSW2 Switches

The company has created the test bed shown in the layer 2 and layer 3 topology exhibits. This network consists of four routers, two layer 3 switches and two layer 2 switches.

In the IPv4 layer 3 topology, R1, R2, R3, and R4 are running OSPF with an OSPF process number 1.

DSW1, DSW2 and R4 are running EIGRP with an AS of 10. Redistribution is enabled where necessary.

R1 is running a BGP AS with a number of 65001. This AS has an eBGP connection to AS 65002 in the ISPu2021s network. Because the companyu2021s address space is in the private range. R1 is also providing NAT translations between the inside (10.1.0.0/16 & 10.2.0.0/16) networks and outside (209.65.0.0/24) network.

ASW1 and ASW2 are layer 2 switches.

NTP is enabled on all devices with 209.65.200.226 serving as the master clock source. The client workstations receive their IP address and default gateway via R4u2021s DHCP server.

The default gateway address of 10.2.1.254 is the IP address of HSRP group 10 which is running on DSW1 and DSW2.

In the IPv6 layer 3 topology R1, R2, and R3 are running OSPFv3 with an OSPF process number 6.

DSW1, DSW2 and R4 are running RIPng process name RIP_ZONE.

The two IPv6 routing domains, OSPF 6 and RIPng are connected via GRE tunnel running over the underlying IPv4 OSPF domain. Redistrution is enabled where necessary.

Recently the implementation group has been using the test bed to do a u2021proof-of-conceptu2021 on several implementations. This involved changing the configuration on one or more of the devices. You will be presented with a series of trouble tickets related to issues introduced during these configurations.

Note: Although trouble tickets have many similar fault indications, each ticket has its own issue and solution.

Each ticket has 3 sub questions that need to be answered & topology remains same. Question-1 Fault is found on which device,

Question-2 Fault condition is related to,

Question-3 What exact problem is seen & what needs to be done for solution

Client is unable to ping IP 209.65.200.241

Solution

Steps need to follow as below:-

u2711 When we check on client 1 & Client 2 desktop we are not receiving DHCP address from R4

Ipconfig ----- Client will be getting 169.X.X.X

u2711 On ASW1 port Fa1/0/ 1 & Fa1/0/2 access port VLAN 10 was assigned which is using IP address 10.2.1.0/24

Sh run ------- & check for running config of int fa1/0/1 & fa1/0/2

====================================================

====================================================

u2711 Here we are not able to see access Vlan10 configured for Port Fa1/0/1 & Fa1/0/2

u2711 Change required: On ASW1, for configuring Access Vlan under interface fa1/0/1 & 1/0/2 we have to enable command switchport access vlan 10


New Questions 18

You are troubleshooting an issue with a GRE tunnel between R1 and R2 and find that

routing is OK on all intermediary routers. The tunnel is up on R1, but down on R2. Which two possible issues can prevent the tunnel from coming up? (Choose Two)

A. The tunnel does not come up unless traffic is sent through it.

B. The tunnel source interface is down on R2.

C. No specific route interface is down on R2.

D. R2 does not know how to reach the tunnel destination.

E. The tunnel keep alive timer doesnu2021t match on R1 and R2.

Answer: B,D

Explanation:

Four Different Tunnel States

There are four possible states in which a GRE tunnel interface can be:

1. Up/up - This implies that the tunnel is fully functional and passes traffic. It is both adminstratively up and it's protocol is up as well.

2. Adminstratively down/down - This implies that the interface has been administratively shut down.

3. Up/down - This implies that, even though the tunnel is administratively up, something causes the line protocol on the interface to be down.

4. Reset/down - This is usually a transient state when the tunnel is reset by software. This usually happens when the tunnel is misconfigured with a Next Hop Server (NHS) that is it's own IP address.

When a tunnel interface is first created and no other configuration is applied to it, the interface is not shut by default:

Topic 2, Troubleshooting VTP

14.A customer network engineer has made configuration changes that have resulted in some loss of connectivity. You have been called in to evaluate a switch network and suggest resolutions to the problems.

Which of statement is true regarding STP issue identified with switches in the given topology?

A. Loopguard configured on the New_Switch places the ports in loop inconsistent state

B. Rootguard configured on SW1 places the ports in root inconsistent state

C. Bpduguard configured on the New_Switch places the access ports in error-disable

D. Rootguard configured on SW2 places the ports in root inconsistent state


P.S. Easily pass 300-135 Exam with Examcollectionplus Virtual Dumps & pdf vce, Try Free: https://www.examcollectionplus.net/vce-300-135/ (146 New Questions)